Construction Scheduling, Cost Optimization and Management

ISBN: 9780415244176

$209.95 $178.46

Construction Scheduling, Cost Optimization and Management presents a general mathematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modelled.L This book presents an entirely new approach to the construction scheduling problem. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and cost optimization, including construction engineers, highway engineers, transportation engineers, contractors and architects. It will also be useful for researchers, and graduates on courses in construction scheduling and planning.

Title:
Construction Scheduling, Cost Optimization and Management
ISBN-10:
041524417X
ISBN-13:
9780415244176
Author:
Hojjat Adeli and Asim Karim
Publisher:
CRC Press
Published Date:
20010315
Binding
Hardback
Pages:
338
Language:
English
Product Dim.:
9.25 H x 6.25 W (inches)

Hojjat Adeli and Asim Karim

Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.

Special Offers and Promotions

Our print to order bookstore saves you money. There are currently no special offers for Construction Scheduling, Cost Optimization and Management

Editorial Reviews

Thank you for selecting our online bookstore. Currently, there are no editorial book reviews for Construction Scheduling, Cost Optimization and Management

About the Author

Hojjat Adeli is Professor of Civil and Environmental Engineering and Geodtic Science and Director of Knowledge Engineering Lab at The Ohio State University. He is a leading, world-renowned researcher and inventor and author of 340 research publications including nine highly acclaimed and pioneering books in the general field of computer-aided engineering (CAE). His ground-breaking research has appeared in 54 different scholarly journals covering many disciplines and had a profound impact on the direction of CAE research. He is the Editor-in-Chief of two prestigious journals Computer-Aided Civil and Infrastructure Engineering and Integrated Computer-Aided Engineering. He is the recipient of numerous awards and honours. In 1998, he was awarded the University Distinguished Scholar Award by The Ohio State University.

About Pubgraphics Direct

PGDirect is an online bookstore that has embraced the concept of direct to consumer selling for self-published books, softcover and hardcover books, specialty books, children's books, hard to find books, college textbooks, print on demand books and more.

Your Cart